top of page
OUR PROJECTS - CASE STUDIES

Arbe Integrated Engineering have carried our a wide variety of projects. Please see below for some of our case studies. Should you require any further information on our projects, please contact us

 

Case Study 37 - 2 Sisters
CS37-Front.jpg
Case Study 37 - 2 Sisters
CS37-Front.jpg

Arbe designed and supplied 3 off HevaCal-CSS semi-storage calorifiers c/w steam primary controls and condensate removal equipment. 

Our units were sized at 2000 litre capacity and 630 kW heat input to provide DHW for one of the factories, each providing over 10,000 litres/hour on a constant basis.

The cylinders were manufactured from copper-lined steel.

As part of the supply, Arbe also designed and supplied a DHW return pump station to provide hot water to 3 ring mains around the factory

Click the image to download the PDF file

Case Study 37 - 2 Sisters
CS37-Front.jpg
Case Study 37 - 2 Sisters
CS37-Front.jpg

Arbe designed and supplied 3 off HevaCal-CSS semi-storage calorifiers c/w steam primary controls and condensate removal equipment. 

Our units were sized at 2000 litre capacity and 630 kW heat input to provide DHW for one of the factories, each providing over 10,000 litres/hour on a constant basis.

The cylinders were manufactured from copper-lined steel.

As part of the supply, Arbe also designed and supplied a DHW return pump station to provide hot water to 3 ring mains around the factory

Click the image to download the PDF file

bottom of page